Loop 121 and MLK Traffic Signal to be Activated on Monday

Loop 121 and MLK Traffic Signal to be Activated on Monday

The traffic signal at the Loop 121 and Martin Luther King Jr. Ave. intersection is scheduled to become operational on Monday, July 11. It will blink for the first 24 hours, before becoming fully operational following the dedication and opening of the MLK bridge on Tuesday, July 12. The dedication and ribbon cutting will take place on the bridge at 1:30 p.m.